Construction Update Archive

Previous schedule of activities:

Week of June 19th

New Windsor

  • No major activities planned

    Hamptonburgh

  • No major activities planned

Blooming Grove

  • No major activities planned

    Chester

  • Grading and drainage work at Sugarloaf Substation

  • Continue right of way restoration

  • Fence installation at Sugarloaf Substation site

  • Testing activities at the Sugarloaf Substation site

  • Minor activities at 43 Andrews Lane Laydown Yard

South Blooming Grove

  • Continue using Route 208 site for matting and access equipment.

    Week of June 12th

New Windsor

  • No major activities planned

    Hamptonburgh

  • No major activities planned

Blooming Grove

  • Continue restoration activities

    Chester

  • Grading and drainage work at Sugarloaf Substation

  • Restoration activities beginning on the project right of way

  • Fence installation at Sugarloaf Substation site

  • Testing activities at the Sugarloaf Substation site

  • Minor activities at 43 Andrews Lane Laydown Yard

South Blooming Grove

  • Continue using Route 208 site for matting and access equipment.

Week of June 5th

New Windsor

  • No major activities planned

    Hamptonburgh

  • No major activities planned

Blooming Grove

  • Continue restoration activities

    Chester

  • Grading and drainage work at Sugarloaf Substation

  • Fence installation at Sugarloaf Substation site

  • Testing activities at the Sugarloaf Substation site

  • Continue removing equipment from 43 Andrews Lane Laydown Yard

South Blooming Grove

  • Continue using Route 208 site for matting and access equipment.

Week of May 29th, 2023 (No Work on May 29th)

New Windsor

  • No major activities planned

    Hamptonburgh

  • No major activities planned

Blooming Grove

  • Continue restoration activities

    Chester

  • Grading and drainage work at Sugarloaf Substation

  • Fence installation at Sugarloaf Substation site

  • Testing activities at the Sugarloaf Substation site

  • Continue removing equipment from 43 Andrews Lane Laydown Yard

South Blooming Grove

  • Continue using Route 208 site for matting and access equipment.

Week of May 22nd, 2023

New Windsor

  • Restoration activities occuring

    Hamptonburgh

  • No major activities planned

Blooming Grove

  • Continue restoration activities

    Chester

  • Grading and drainage work at Sugarloaf Substation

  • Fence installation at Sugarloaf Substation site

  • Testing activities at the Sugarloaf Substation site

  • Continue removing equipment from 43 Andrews Lane Laydown Yard

South Blooming Grove

  • Continue using Route 208 site for matting and access equipment.

Week of May 15th, 2023

New Windsor

  • Continue restoration activities

    Hamptonburgh

  • Continue restoration activities

Blooming Grove

  • Continue restoration activities

    Chester

  • Grading and drainage work at Sugarloaf Substation

  • Fence installation at Sugarloaf Substation site

  • Testing activities at the Sugarloaf Substation site

  • Finish activities at the 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Continue removing equipment from 43 Andrews Lane Laydown Yard

South Blooming Grove

  • Continue using Route 208 site for matting and access equipment.

Week of May 8th, 2023

New Windsor

  • Continue restoration activities

    Hamptonburgh

  • Continue restoration activities

Blooming Grove

  • Continue restoration activities

    Chester

  • Grading and drainage work at Sugarloaf Substation

  • Fence installation at Sugarloaf Substation site

  • Testing activities at the Sugarloaf Substation site

  • Finish activities at the 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Start removing equipment from 43 Andrews Lane Laydown Yard

South Blooming Grove

  • Continue using Route 208 site for matting and access equipment.

Week of May 1st, 2023

New Windsor

  • Continue restoration activities

    Hamptonburgh

  • Continue restoration activities

Blooming Grove

  • Continue restoration activities

    Chester

  • Grading and drainage work at Sugarloaf Substation

  • Fence installation at Sugarloaf Substation site

  • Testing activities at the Sugarloaf Substation site

  • Complete restoration activities at the 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Start removing equipment from 43 Andrews Lane Laydown Yard

South Blooming Grove

  • Continue using Route 208 site for matting and access equipment.

Week of April 24th, 2023

New Windsor

  • Continue restoration activities

    Hamptonburgh

  • Continue restoration activities

Blooming Grove

  • Continue restoration activities

    Chester

  • Conduit and cable work at Sugarloaf Substation

  • Fence installation at Sugarloaf Substation site

  • Testing activities at the Sugarloaf Substation site

  • Complete testing activities at 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

South Blooming Grove

  • Continue using Route 208 site for matting and access equipment.

Week of April 17th, 2023

New Windsor

  • Continue restoration activities

  • Conductor and fiber optic wire installation outside the Rock Tavern Substation

    Hamptonburgh

  • Continue restoration activities

  • Finalize equipment on installed structures

Blooming Grove

  • Begin restoration activities

  • Finalize equipment on installed structures

    Chester

  • Clip conductor to structures between Booth Road and the Sugarloaf Substation

  • Grounding work at Sugarloaf Substation site

  • Complete retaining wall installation

  • Fence installation at Sugarloaf Substation site

  • Fiber optic testing at the Sugarloaf Substation site

  • Testing activities at 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

South Blooming Grove

  • Continue using Route 208 site for matting and access equipment.

Week of April 10th, 2023

New Windsor

  • Continue restoration activities

    Hamptonburgh

  • Continue restoration activities

Blooming Grove

  • Continue restoration activities

  • Finalize equipment on installed structures

    Chester

  • Install transmission line conductor and fiber optic cable

  • Sag wires between Booth Road and the Sugarloaf Substation

  • Grounding work at Sugarloaf Substation site

  • Install retaining wall at Sugarloaf Substation

  • Testing activities at 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

South Blooming Grove

  • Continue using Route 208 site for matting and access equipment.

Week of April 3rd, 2023

New Windsor

  • Continue restoration activities

  • Finalize equipment on installed structures

    Hamptonburgh

  • Continue restoration activities

  • Finalize equipment on installed structures

Blooming Grove

  • Begin restoration activities

  • Finalize equipment on installed structures

    Chester

  • Install transmission line conductor and fiber optic cable

  • Sag wires between Booth Road and the Sugarloaf Substation

  • Grounding work at Sugarloaf Substation site

  • Fence installation at Sugarloaf Substation site

  • Testing activities at 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

South Blooming Grove

  • Removing materials from Route 208 laydown yard. Begin using site for matting and access equipment.

Week of March 27th, 2023

New Windsor

  • Begin restoration activities

  • Finalize equipment on installed structures

    Hamptonburgh

  • Begin restoration activities

  • Finalize equipment on installed structures

Blooming Grove

  • Finalize equipment on installed structures

    Chester

  • Set steel structures outside Sugarloaf Substation

  • Sagging and clipping new conductor to transmission structures

  • Grounding work at Sugarloaf Substation site

  • Fence installation at Sugarloaf Substation site

  • Testing activities at 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

South Blooming Grove

  • Removing materials from Route 208 laydown yard. Begin using site for matting and access equipment.

    Week of March 20th, 2023

    New Windsor

    • No major work anticipated

      Hamptonburgh

    • No major work anticipated

    Blooming Grove

    • Clipping and sagging of conductor a between Prospect Road and the Town of Chester

      Chester

    • Sagging and clipping new conductor to transmission structures

    • Grounding work at Sugarloaf Substation site

    • Fence installation at Sugarloaf Substation site

    • Testing activities at 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

    • Materials receiving at 43 Andrews Lane Laydown Yard

    South Blooming Grove

    • Removing materials from Route 208 laydown yard. Begin using site for matting and access equipment.

Week of March 13th, 2023

New Windsor

  • No major work anticipated

    Hamptonburgh

  • No major work anticipated

Blooming Grove

  • helicopter operations between Prospect Road and the Town of Chester

    Chester

  • helicopter work to install new conductor on transmission structures

  • Grounding work at Sugarloaf Substation site

  • Fence installation at Sugarloaf Substation site

  • Testing activities at 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

South Blooming Grove

  • Removing materials from Route 208 laydown yard. Begin using site for matting and access equipment.

Week of March 6th, 2023

New Windsor

  • No major work anticipated

    Hamptonburgh

  • No major work anticipated

Blooming Grove

  • Wire stringing via helicopter

  • Prepare structures for wire stringing

  • Complete setting structures

    Chester

  • Sagging and clipping new conductor to transmission structures

  • Transformer assembly at the new 115kV Sugarloaf Substation

  • Grounding work at Sugarloaf Substation

  • Prepare for fence installation at Sugarloaf Substation

  • Retaining wall installation at Sugarloaf Substation

  • Testing activities at 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

South Blooming Grove

  • Removing materials from Route 208 laydown yard.

Week of February 27th, 2023

New Windsor

  • No major work anticipated

    Hamptonburgh

  • No major work anticipated

Blooming Grove

  • Complete clipping and sagging north of Prospect Road

  • Prepare for clipping and sagging south of Prospect Road

  • Structure installations south of Bull Mine Road

    Chester

  • Structure Installations

  • Structural steel installation scheduled for completion at the Sugarloaf Substation site

  • Foundation installations near Sugarloaf Mountain Road

  • Grounding work at Sugarloaf substation site

  • Testing of equipment at 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

South Blooming Grove

  • Removing materials from Route 208 Laydown yard

Week of February 20, 2023

New Windsor

  • No major work anticipated

    Hamptonburgh

  • No major work anticipated

Blooming Grove

  • Structure installation near Farmingdale Road

  • Conductor and optical ground wire installation between Tuthill Road and Prospect Road

  • Steel structure installation south of Prospect Road

Chester

  • Foundation and structure installation near Booth Road, Laroe Road, and Sugarloaf Mountain Road

  • Sugarloaf Substation Autotransformer assembly, and oil processing

  • Structural steel will be installed at the substation site

  • Grounding work at substation site

  • Equipment installations at 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

South Blooming Grove

  • Materials receiving and sorting at Route 208 Laydown Yard

Week of February 13, 2023

New Windsor

  • Sag and clip conductor

    Hamptonburgh

  • Sag and clip conductor

Blooming Grove

  • Foundation installation in locations near Old Mansion Road

  • Install structure near Prospect Road

  • Sag and clip conductor

Chester

  • Foundation and structure installation near Booth Road and Laroe Road

  • Sugarloaf Substation autotransformer delivery, assembly, and oil processing

  • Structural steel and H-frame structure will be installed at the Sugarloaf Substation site

  • Control building assembly at Sugarloaf Substation

  • Begin substation retaining wall installation

  • Equipment installations including wire and grounding at 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

South Blooming Grove

  • Materials receiving and sorting at Route 208 Laydown Yard

Week of February 6, 2023

  • New Windsor

    • No major work anticipated

    Hamptonburgh

    • No major work anticipated

    Blooming Grove

    • Foundation installation in locations near Old Mansion Road

    • Structure installation near Farmingdale Road

    • Sag and clip conductor

    Chester

  • Foundation and structure installation near Laroe Road and Sugarloaf Mountain Road

  • Structural steel will be installed at the substation site

  • Control building assembly at Sugarloaf Substation

  • Equipment installations at 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

  • Ground grid and ground well installations at Sugarloaf 115kV Substation

    South Blooming Grove

  • Materials receiving and sorting at Route 208 Laydown YardWeek of January 30, 2023

New Windsor

  • No major work anticipated

Hamptonburgh

  • No major work anticipated

Blooming Grove

  • Foundation installation at locations near Old Mansion Road

  • Structure installation near Farmingdale Road

  • String conductor and Optical Ground Wire (OPGW)

  • Sag and clip conductor

Chester

  • Foundation and structure installation near Laroe Road and Sugarloaf Mountain Road

  • Structural steel will be installed at the substation site

  • Control building assembly at Sugarloaf Substation

  • Equipment and conduit installations at 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

  • Ground grid and ground well installations at Sugarloaf 115kV Substation

South Blooming Grove

Materials receiving and sorting at Route 208 Laydown Yard

Week of January 23, 2023

New Windsor

  • String conductor and Optical Ground Wire (OPGW)

  • Sag and clip conductor

Hamptonburgh

  • String conductor and Optical Ground Wire (OPGW)

  • Sag and clip conductor

Blooming Grove

  • Foundation and structure installation at multiple locations

  • String conductor and Optical Ground Wire (OPGW)

  • Sag and clip conductor

Chester

  • Foundation and structure installation at multiple locations

  • Structural steel will be installed at the new Sugarloaf Substation

  • Equipment installations at 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Control building assembly at Sugarloaf Substation

  • Materials receiving at 43 Andrews Lane Laydown Yard

  • Ground grid and ground well installations at Sugarloaf 115kV Substation

South Blooming Grove

  • Materials receiving and sorting at Route 208 Laydown Yard

    Week of January 15, 2023

New Windsor

  • Helicopter wire stringing

Hamptonburgh

  • Helicopter wire stringing

Blooming Grove

  • Helicopter wire stringing

  • Concrete foundation installation at multiple locations

  • Structure Installation

Chester

  • The Sugarloaf Substation pre-fabricated control house is scheduled to be delivered on January 18th

  • Structural steel will be installed at the substation site

  • Equipment installations at 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

  • Ground grid and ground well installations at Sugarloaf 115kV Substation

South Blooming Grove

  • Materials receiving and sorting at Route 208 Laydown Yard

    Week of January 2, 2023

New Windsor

  • Setup pulling equipment in right of way

Hamptonburgh

  • Setup pulling equipment in right of way

Blooming Grove

  • Structure installation

  • Concrete foundation installation at multiple locations

Chester

  • Foundations work for structures off Sugar Loaf Mountain Road

  • Clearing work in right of way

  • Equipment installations at 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

  • Ground grid, cable trench and steel staging at Sugarloaf 115kV Substation

South Blooming Grove

  • Materials receiving and sorting at Route 208 Laydown Yard

  • Week of December 25, 2022

No Work

Week of December 18, 2022

New Windsor

  • No work

Hamptonburgh

  • No work

Blooming Grove

  • Structure installation

  • Concrete foundation installation

Chester

  • No Transmission line work

  • Grounding and equipment installations at 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

  • Pad building, soil removal, foundation installations and below grade work at Sugarloaf 115kV Substation

South Blooming Grove

Materials receiving and sorting at Route 208 Laydown Yard

Week of December 12, 2022 (Work taking place on Sunday, December 18 north of Prospect Road in Blooming Grove)

New Windsor

  • No work

Hamptonburgh

  • No work

Blooming Grove

  • Structure installation

  • Concrete foundation installation

Chester

  • No Transmission line work

  • Grounding and equipment installations at 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

  • Pad building, soil removal, foundation installations and below grade work at Sugarloaf 115kV Substation

South Blooming Grove

Materials receiving and sorting at Route 208 Laydown Yard

Week of December 5, 2022

New Windsor

  • No work

Hamptonburgh

  • No work

Blooming Grove

  • Structure installation

  • Concrete foundation installation

Chester

  • Existing structure demolition and removal

  • Grounding installations and equipment setting at 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

  • Pad building, soil removal, foundation installations and below grade work at Sugarloaf 115kV Substation

South Blooming Grove

  • Materials receiving and sorting at Route 208 Laydown Yard

Week of November 28, 2022

New Windsor

  • No work

Hamptonburgh

  • Structure installation

  • Concrete foundation installation

Blooming Grove

  • Structure installation

  • Concrete foundation installation

Chester

  • Existing structure demolition and removal

  • Grounding installations and equipment setting at 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

  • Pad building, soil removal, foundation installations and below grade work at Sugarloaf 115kV Substation

South Blooming Grove

  • Materials receiving and sorting at Route 208 Laydown Yard

Week of November 21, 2022 (no work Nov. 23-25)

New Windsor

  • No work

Hamptonburgh

  • Structure installation

  • Concrete foundation installation

Blooming Grove

  • Concrete foundation installation

Chester

  • Access road installation

  • Existing structure demolition and removal

  • Grounding installations and equipment setting at 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

  • Pad building, soil removal, foundation installations and below grade work at Sugarloaf 115kV Substation

South Blooming Grove

  • Materials receiving and sorting at Route 208 Laydown Yard

Week of November 14, 2022

New Windsor

  • Structure installation

Hamptonburgh

  • Structure installation

  • Concrete foundation installation

Blooming Grove

  • Concrete foundation installation

Chester

  • Existing structure demolition and removal

  • Above grade grounding work at 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

  • Pad building, soil removal, foundation installations and below grade work at Sugarloaf 115kV Substation

South Blooming Grove

  • Materials receiving and sorting at Route 208 Laydown Yard

Week of November 7, 2022

New Windsor

  • Structure installation

Hamptonburgh

  • Concrete foundation installation

Blooming Grove

  • Existing structure demolition and removal

Chester

  • Access road and pad building

  • Existing structure demolition and removal

  • Steel and grounding installations 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

  • Pad building, soil removal, foundation installations and below grade work at Sugarloaf 115kV Substation

South Blooming Grove

  • Materials receiving and sorting at Route 208 Laydown Yard

Week of October 31, 2022

New Windsor

  • Concrete foundation installation

Hamptonburgh

  • Concrete foundation installation

Blooming Grove

  • Access road and pad building

  • Concrete foundation installation

Chester

  • Access road and pad building

  • Steel and grounding installations 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

  • Excavation, grading, soil removal, foundation installations and below grade work at Sugarloaf 115kV Substation

South Blooming Grove

  • Materials receiving and sorting at Route 208 Laydown Yard

Week of October 24, 2022

New Windsor

  • Concrete foundation installation

Hamptonburgh

  • Existing overhead wire and structure demolition and removal

  • Concrete foundation installation

Blooming Grove

  • Access road and pad building

  • Existing overhead wire and structure demolition and removal

  • Concrete foundation installation

Chester

  • Access road and pad building

  • Grounding and stell installations 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

  • Excavation, grading, soil removal, foundation installations and below grade work at Sugarloaf 115kV Substation

South Blooming Grove

  • Materials receiving and sorting at Route 208 Laydown Yard

Week of October 17, 2022

New Windsor

  • Existing overhead wire and structure demolition and removal

  • Concrete foundation installation

Hamptonburgh

  • Existing overhead wire and structure demolition and removal

  • Concrete foundation installation

Blooming Grove

  • Existing overhead wire and structure demolition and removal

  • Concrete foundation installation

Chester

  • Access road and pad building

  • Steel and grounding installations 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

  • Excavation, grading, soil removal, foundation installations and below grade work at Sugarloaf 115kV Substation

South Blooming Grove

  • Materials receiving and sorting at Route 208 Laydown Yard

Week of October 10, 2022

New Windsor

  • Existing overhead wire and structure demolition and removal

Hamptonburgh

  • Existing overhead wire and structure demolition and removal

Blooming Grove

  • Access road and pad building

  • Existing overhead wire and structure demolition and removal

Chester

  • Access road and pad building

  • Steel hauling and grounding installations 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

  • Excavation, grading, soil removal, foundation installations and below grade work at Sugarloaf 115kV Substation

South Blooming Grove

  • Materials receiving and sorting at Route 208 Laydown Yard

Week of October 3, 2022

New Windsor

  • Concrete foundation installation

Hamptonburgh

  • No work

Blooming Grove

  • Access road and pad building

  • Existing overhead wire and structure demolition and removal

Chester

  • Access road and pad building

  • Below grade and grounding work at the 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

  • Excavation, grading, soil removal, and foundation work at Sugarloaf 115kV Substation

South Blooming Grove

  • Materials receiving and sorting at Route 208 Laydown Yard

Week of September 26, 2022

New Windsor

  • Existing overhead wire and structure demolition and removal

  • Concrete foundation installation

Hamptonburgh

  • Existing overhead wire and structure demolition and removal

Blooming Grove

  • Access road and pad building

  • Existing overhead wire and structure demolition and removal

Chester

  • Concrete foundation installation

  • Access road and pad building

  • Below grade and grounding work at the 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

  • Excavation, grading, soil removal, and foundation work at Sugarloaf 115kV Substation

South Blooming Grove

  • Materials receiving, offloading, and sorting at Route 208 Laydown Yard

Week of September 19, 2022

New Windsor

  • Existing overhead wire and structure demolition and removal

Hamptonburgh

  • Existing overhead wire and structure demolition and removal

Blooming Grove

  • Existing overhead wire and structure demolition and removal

  • Access road and pad building

Chester

  • Concrete foundation installation

  • Access road and pad building

  • Foundation and below grade work at the 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving and offloading at 43 Andrews Lane Laydown Yard

  • Excavation, grading, soil removal, and foundation work at Sugarloaf 115kV Substation

South Blooming Grove

  • Materials receiving and foundation reinforcing steel work at Route 208 Laydown Yard

Week of September 12, 2022

New Windsor

  • Existing overhead wire and structure demolition and removal

Hamptonburgh

  • Existing overhead wire and structure demolition and removal

Blooming Grove

  • Access road and pad building throughout the project corridor

Chester

  • Concrete foundation installation

  • Foundation work at the 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

  • Excavation, grading, soil removal and foundation work at Sugarloaf 115kV Substation

South Blooming Grove

  • Materials receiving and foundation reinforcing steel work at Route 208 Laydown Yard

Week of September 5, 2022

New Windsor

  • Access road and pad building throughout the project corridor

Hamptonburgh

  • No work

Blooming Grove

  • Access road and pad building throughout the project corridor

Chester

  • Surveying and staking in the project corridor

  • Concrete foundation installation and curing

  • Foundation and below grade work at the 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Materials receiving at 43 Andrews Lane Laydown Yard

  • Excavation, grading, soil removal and demolition of structure foundations at Sugarloaf 115kV Substation

South Blooming Grove

  • Materials receiving at Route 208 Laydown Yard

Week of August 29, 2022

New Windsor

  • No T-Line work

Hamptonburgh

  • Access road and pad building throughout the project corridor

Blooming Grove

  • Access road and pad building throughout the project corridor

Chester

  • Access road and pad building throughout the project corridor

  • Soil removal and foundation work at the 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Receiving materials at the 43 Andrews Lane Laydown Yard

  • Demolition of structure foundations at Sugarloaf 115kV Substation

South Blooming Grove

  • Receiving materials and concrete work at Route 208 Laydown Yard

Week of August 22, 2022

New Windsor

  • No T-Line work

Hamptonburgh

  • Access road and pad building throughout the project corridor

Blooming Grove

  • Surveying and staking in the project corridor

  • Access road and pad building throughout the project corridor

Chester

  • Surveying and staking in the project corridor

  • Soil removal at the 138kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Receiving materials at the 43 Andrews Lane Laydown Yard

  • Excavation, grading, excess soil removal and demolition of structure foundations at Sugarloaf 115kV Substation

South Blooming Grove

  • Receiving materials and concrete work at Route 208 Laydown Yard

Week of August 15, 2022

New Windsor

  • No work

Hamptonburgh

  • Access road and pad building throughout the project corridor

Blooming Grove

  • Surveying and staking in the Bull Mill Road area

  • Access road and pad building throughout the project corridor

Chester

  • Surveying and staking in the Booth Road and Bull Mill Road areas

  • Excavation, grading, excess soil removal and demolition of existing structures at Sugarloaf 115kV Substation

  • Erosion and sediment control installation at the Sugarloaf 138kV Substation

South Blooming Grove

  • No work

Week of August 8, 2022

New Windsor

  • No work

Hamptonburgh

  • Access road and pad building in the Route 208 and Tuthill Road areas

Blooming Grove

  • Survey work in the Route 17 area

  • Access road and pad building throughout the project corridor

Chester

  • Materials delivery at 43 Andrews Lane Laydown Yard

  • Excavation, grading, excess soil removal and demolition of existing structures at Sugarloaf 115kV Substation

  • Erosion and sediment control installation at the Sugarloaf 138kV Substation

South Blooming Grove

  • Steel structures and equipment delivery at Route 208 Laydown Yard

Week of August 1, 2022

New Windsor

  • No work

Hamptonburgh

  • Access road and construction workspace installation in the Tuthill Road and Route 208 areas

Blooming Grove

  • Access road and construction workspace installation in the Tuthill Road and Prospect Road areas

Chester

  • Material delivery at 43 Andrews Lane Laydown Yard

  • Erosion control measures at the 138 kV Sugarloaf Substation off Sugar Loaf Mountain Road

  • Excavation, grading, and demolition of existing equipment at the Sugarloaf 115kV Substation

South Blooming Grove

  • Delivery of equipment and materials at Route 208 Laydown Yard